Concrete Bag Calculator

Find the number of concrete bags from your required volume and the yield printed on the bag.

Your project measurements

yd³
ft³
%
$

Results update as you type. U.S. units. Defaults are editable planning examples. Use product labels and supplier specifications.

Your material plan

Enter your measurements to see your plan.

A quantity estimate, not a supplier quote. Confirm order increments, delivery and project specifications.

MaterialScope.com · Plan it. Measure it. Build it.

How this calculation works

Enter measurements above to see the worked calculation.

Start with the space you need to fill

For one net cubic yard, a 10% allowance gives 29.7 cubic feet. At 0.60 cubic feet per bag, this requires 49.5 bags, so the purchase quantity is 50. Enter net volume here; if your volume already includes extra material, set the allowance to zero.

Volume, allowance and an order are different

Net volume is the space to fill. The allowance adds extra material for variation in excavation, forms and handling. A supplier may then round the order to its available increments. Our decimal result does not apply that final supplier rounding. For multiple sections, calculate each section and add the unrounded volumes before ordering.

Bag equivalents are alternatives

The displayed 60-lb and 80-lb equivalents use illustrative yields of 0.45 and 0.60 cubic feet. They are alternatives to a ready-mix delivery, not additional materials. A bag’s weight alone does not determine its yield. Check the product you will actually buy.

Product reference: QUIKRETE concrete mix technical data. Confirm the current label for your chosen product.

Choose how to buy your concrete

Compare bagged concrete with a ready-mix delivery, including handling and fees. If buying bags, see our QUIKRETE vs. Sakrete product comparison for published yields and a project-cost example.

Make the estimate your own

Measure the actual area, choose your product and update the allowance. Costs use the price you enter. Delivery, tax, labor and preparation are excluded unless this tool has a separate field for them. The result rounds whole packages up; displayed decimal quantities are not supplier order increments.

Before you order

  • Check dimensions and units, including depth and openings.
  • Confirm the selected product’s coverage, yield or density.
  • Ask your supplier about package sizes, minimum orders and delivery access.
  • Keep a copy of your measurements with your material plan.

Method v1.0 · Updated October 23, 2026. Read our methodology.